LIVE WEBINAR

Kuya Silver Webinar
Bethania Mine: High-Grade Silver Production


About Bethania Silver Project​​​​​​​​​​​​​​​​​​​​​
​​​​​​​​​​​​​​Kuya Silver is currently advancing the Bethania Silver Mine, which was in production until 2016, toll milling its high-grade ore at various concentrate plants in the region. In 2024, the Company will commence toll milling again as a low cost way to restart production allowing Kuya to grow production through cash flow.

  • Excellent Access & Rich History:
    ​​​​​
    • 100% ownership, no royalty or streams
    • Access mine by road from Huancayo (major city)
    • Shallow Initial Resource: 63% of Indicated Silver Equivalent Resource Estimate located above historical production adit, and open at depth
    • Grade: Bethania Mine is a high-grade silver project with indicated resource grade of 469 g/t Ag eq and historic production grades of ~650 g/t Ag eq
    • Upside: Significant growth potential along strike, at depth, nearby satellite vein systems

  • Toll Milling Development & Production 
    •  In January 2024, Kuya commenced underground development and reconditioning with toll milling expected to commence in H2 2024. 
    •  Production (head) grade of 13.8 oz/t (or 429 g/t) silver eq in year 1 (from 2023 PEA)
    •  Silver production of 1.37 Million oz eq in first full year of toll milling production (see
    2023 PEA)
    ​​​​

    Bethania Silver Project PEA - Click HERE
    Disclaimer - Click HERE

  • David Stein

    President & CEO

  • Christian Aramayo

    Chief Operating Officer

  • Cory Fleck

    Webinar Host

  • , ,